Torsionally Rigid

ZAL with fully split hub and CFK tube
10 – 800 Nm

  • Low moment of inertia
  • For spanning large distances between shaft ends
  • Standard lenghts up to 6 metres
  • No intermediate support bearings required

For more information click here.

ZA with clamping hubs
10 – 800 Nm

  • For spanning large distances between end shafts
  • Standard lengths up to 6 metres
  • No intermediate support bearings required

For more information click here.

ZAE with fully split clamping hub
10 – 800 Nm

  • Low moment of inertia
  • For spanning large distances between shaft ends
  • Standard lengths up to 6 metres
  • No intermediate support bearings required

For more information click here.

ZA with conical clamping system
1,500 – 4,000 Nm

  • For spanning large distances between shaft ends
  • Standard lengths up to 6 metres
  • No intermediate support bearings required

For more information click here.

Elastic

EZ2 with fully split clamping hub
9 – 25,000 Nm

  • Easy installation and removal
  • Standard lengths up to 4 metres
  • No intermediate support bearings required

For more information click here.

EZV adjustable length with fully split clamping hub
12.5 – 1,200 Nm

  • Telescoping for adjustable length and rotational orientation
  • Very easy to install and remove
  • No intermediate support bearings required

For more information click here. 

Downloads

Description

R+W line shaft couplings are wear and maintenance free for an infinite service life, as long as the technical limits are not exceeded.

Related Products

Screw Jacks

Ball Screws

Graessner PowerGear

Latest News

Fanuc Robotics Product Awareness Day

On Thursday 17th May our Technical Sales Manager, Matt Jones, [...]

Is your planetary gearhead the right size?

Planetary gearheads are high-precision, motion-control devices that generate substantial torque [...]

10 tips on choosing the right coupling

10 tips for using couplings in your application Choosing the [...]

  • david and peter at graessner

Pete and David in Germany at MS Graessner

Our sales engineers Peter Moody (South East) and David Wood [...]