Increasing plant uptime

Increasing plant uptime

 Steel production is designed as a continuous process, which means that you need components you can rely on. One example which is historically known to require a lot of maintenance is the pairing of roller conveyor drives with torsionally flexible...
R+W; meet Kai

R+W; meet Kai

R+W have introduced a new employee, Kai Kupplung, in a series of videos which explain their product range – here Kai talks about couplings, with some examples for the engineering industry.